Mechanical (HVAC)

St. Clair College HVAC Unit Replacements

STATUS

Active – Open for Bidding

LOCATION

Windsor, ON

CONTRACT VALUE

$200 000 – $300 000

EST. NET MARGIN (15%)

$30 000 – $45 000

EXECUTIVE SUMMARY

Replacement of two major rooftop units at the Ford Centre for Excellence in Manufacturing. This is a high-precision mechanical contract requiring specific equipment brands and strict adherence to roof-load specifications.

THE TECHNICAL EDGE

  • Brand Lock: Specifications explicitly mandate Engineered Air (Models RTU-1 and MUA-1). Alternatives will not be accepted due to existing curb footprints.
  • Rigging Requirement: Units are located on a restricted-access roof; crane plan must be submitted 48 hours prior to lift.
  • Mandatory Site Visit: February 12, 2026, at 11:00 AM. Attendance is a pass/fail prerequisite.
  • Bonding: 10% Bid Bond and 50% Performance Bond required.
View RFQ Website
Subscribers only

Janitorial (Recurring Service)

Ornge Air Ambulance Base Services

STATUS

Multi-Year Contract Opportunity

LOCATION

Sudbury, ON

CONTRACT VALUE

$135 000 – $225 000 (over 3 years)

EST. NET MARGIN (15%)

$20 250 – $33 750

EXECUTIVE SUMMARY

A 3-year recurring service contract for the Ornge Sudbury Base. Requires 4-day-per-week cleaning of specialized medical-aviation facilities. Perfect 'anchor' contract for a mid-sized crew.

THE TECHNICAL EDGE

  • Security Clearance: All staff must pass a Level 2 Background Check (Criminal Record & Judicial Matters) due to airside access.
  • Access RSVP: You must email the RFP coordinator by Feb 17th at 12:00 PM to attend the mandatory site walkthrough. No walk-ins allowed.
  • Environmental Spec: Must use Green Seal certified cleaning products exclusively; logs must be maintained on-site.
View RFQ Website
Subscribers only

General Renovation (ICI)

St. Benedict Indigenous Support Room Build-Out

STATUS

Seasonal Peak Project

LOCATION

Sudbury, ON

CONTRACT VALUE

$175 000 – $400 000

EST. NET MARGIN (15%)

$26 250 – $60 000

EXECUTIVE SUMMARY

Interior renovation of Room 247 at St. Benedict. Project involves demolition, new millwork, acoustic ceiling treatments, and updated electrical/HVAC distribution for a ceremonial space.

THE TECHNICAL EDGE

  • The 'Two-Envelope' Trap: This is a digital submission in two distinct 'envelopes.' If any pricing data is found in Envelope 1 (Technical), the bid is automatically disqualified.
  • Acoustic Specs: Walls must be built 'slab-to-slab' with specialized sound-rated caulking at the top and bottom tracks.
  • Strict Timeline: Substantial completion is fixed for August 28, 2026. Liquidated damages apply for late delivery.
  • Mandatory Site Visit: February 11, 2026, at 3:30 PM.